New home build FAQ
Building a custom home raises a different set of questions from a remodel, because everything starts from an empty lot and a blank page. These are the questions Nashville area owners ask most often before they commit.
Questions and answers
Do I need an architect to build a custom home in Tennessee?
Tennessee law does not require a licensed architect for most single family homes, so a builder or draftsman can legally produce plans for many houses. Owners still hire architects for site planning, design quality, and permit drawings that anticipate review questions. Subdivision design review boards in places like Franklin and Brentwood may also expect professionally prepared plans.
Should I hire an architect before or after buying land?
Before, whenever possible. An architect can check setbacks, slope, floodplain, utility access, and overlay rules on a lot before you own it, and those factors decide what can be built. A short feasibility review on a lot costs far less than discovering a problem after closing.
How long does it take to design a custom home?
Most custom homes take four to nine months from first sketches to permit ready drawings. The range depends on the size of the house, how quickly the owner makes decisions, and whether reviews such as historic or subdivision approval are involved. Construction itself commonly takes nine to fourteen months after that.
What does the architect need from me to start?
Three things: a survey of the lot, a written program listing the rooms and spaces you need, and an honest budget range. With those in hand, the architect can test whether the program fits the lot and the budget before detailed design begins. Without them, early drawings are mostly guesswork.
What is schematic design?
Schematic design is the first design phase, where the architect develops rough floor plans, the general shape of the house, and its position on the lot. Nothing is final at this stage, and changes are expected and inexpensive. Later phases add construction detail, materials, and engineering coordination.
Do I need a separate interior designer?
Not necessarily. Many architects handle interior selections as part of their service, and many owners hire an interior designer for finishes, furniture, and lighting. The important thing is to decide early who is making which selections, because those decisions sit on the construction schedule.
Who hires the structural engineer?
It varies by firm. Some architects coordinate engineering under their contract and pass the cost through, while others ask the owner to contract with the engineer directly. Either way, the engineer is a separate professional cost from the architect fee, and the arrangement should be in writing before design starts.
Can the architect work with a builder I already have?
Yes, and early builder involvement often helps, because the builder can flag cost and construction issues while the design is still flexible. Some owners instead complete the drawings first and bid the project to several builders. Both approaches work, and the architect can explain the trade offs for your situation.
What happens if construction bids come in over budget?
The usual response is a structured round of adjustments: deferring phases, simplifying details, and substituting materials while protecting the parts of the design that matter most. This is sometimes called value engineering. It works best when the drawings are complete, because every builder is pricing the same revised scope.
Can I change the design after construction starts?
You can, but it is the most expensive time to change anything, and the builder prices the change as a change order with a schedule effect. Small finish changes are usually manageable. Structural or layout changes after framing should be reserved for genuine problems, not new preferences.
Ready to talk through a lot or a house plan? Start with the project readiness checklist.