Architects in Nashville

Permitting FAQ, in depth

The permitting guide covers the basic sequence. This page goes deeper on the questions that come up once a real project is underway and the details start to matter.

Questions and answers

Which projects need a building permit in Metro Nashville?

New buildings, additions, structural changes, and most work on electrical, plumbing, and mechanical systems need permits. Cosmetic work like paint, flooring, and like for like cabinet replacement usually does not. The list has gray areas, such as some deck and fence work, so the safe move is to ask Metro Codes about your exact scope before starting.

What is the difference between zoning review and building permit review?

Zoning review checks whether the project is allowed on the lot at all: use, setbacks, height, and lot coverage. Building permit review checks whether the construction itself meets code: structure, fire safety, energy, and systems. A project must pass zoning logic before building review makes sense, which is why the two are often confused but never interchangeable.

How long does permit review take in Nashville?

Straightforward residential permits are often reviewed in a few weeks, while projects needing multiple departments, historic review, or corrections take longer. Commercial review commonly runs longer than residential. The biggest variable owners control is the completeness of the first submission, because every correction cycle adds a round trip.

What drawings does Metro Codes require?

A typical residential permit set includes a site plan, floor plans, elevations, foundation and framing plans, and details showing code compliance. Commercial sets add life safety plans, accessibility details, and engineering. The exact list depends on scope, and your architect assembles it based on the project's review path.

What is the difference between a permit set and a construction set?

A permit set contains what reviewers need to check code compliance. A construction set contains everything the builder needs to build, including finishes, details, and schedules that reviewers never see. On small projects the two are nearly the same document, while on large projects the construction set keeps growing after the permit is issued.

Can I submit permits myself as a homeowner?

Homeowners can act as their own applicant for work on a home they live in, and Metro allows owner builders in many residential cases. The trade off is that you own every correction comment and every inspection scheduling detail. Many owners have the architect or contractor submit, because they answer reviewer questions every week.

What happens if I build without a permit?

Metro can issue a stop work order, require the work to be exposed for inspection, and in some cases require removal. Permit fees after the fact are higher, and the violation follows the property into resale disclosures and appraisal problems. It is one of the most expensive shortcuts in construction, and it rarely stays hidden.

Do Franklin and Brentwood follow the same process as Metro Nashville?

No. Franklin and Brentwood run their own codes departments with their own forms, review steps, and timelines, and Williamson County handles areas outside city limits. The logic is similar everywhere, but the details are local. This is a practical reason to hire professionals who permit work in your specific jurisdiction regularly.

What is a grading permit and when is it needed?

A grading permit covers moving earth: cutting, filling, and changing drainage on a site. Projects that disturb enough land area, change drainage patterns, or sit near streams and floodplains can need one, along with erosion controls during construction. Builders sometimes discover this requirement late, so it belongs in the first feasibility conversation.

When do drawings need a licensed architect's stamp?

Tennessee requires stamped drawings from a licensed design professional for most commercial buildings, multi family housing, and assembly uses. Single family homes are often exempt, though structural elements may still need an engineer. Some jurisdictions and subdivision review boards ask for stamped plans even where the state does not, so confirm for your project type.

Return to the permitting guide for the step by step sequence.

Request a free consultation